Tipper – The Critical Path
Label: |
Higher Ground – 4946851000 |
---|---|
Format: |
|
Country: |
UK |
Released: |
|
Genre: |
Electronic |
Style: |
Experimental |
Tracklist
A1 | Twister | 6:20 | |
A2 | L.E.D Down | 6:15 | |
B1 | Seldom Vile | 7:15 | |
B2 | Supersport | 6:10 | |
C1 | Sort Code | 5:45 | |
C2 | Dissolve (In) | 5:17 | |
C3 | Dissolve (Out) | 4:09 | |
D1 | Night Vision | 5:44 | |
D2 | Last Informer | 6:47 | |
D3 | On Condition (The Condition) | 6:53 |
Companies, etc.
- Phonographic Copyright ℗ – Sony Music Entertainment (UK) Ltd.
- Copyright © – Sony Music Entertainment (UK) Ltd.
- Published By – Chrysalis Music Ltd.
- Distributed By – Sony Music
Credits
- Arranged By [Strings] – Tipper (tracks: A2, C2, D2, D3)
- Artwork [Airbrush Art] – Adrian Chestermann*
- Design – The Designers Republic
- Lacquer Cut By – Paul's*
- Lyrics By – Tipper (tracks: A2, C3, D2)
- Producer, Written-By – Tipper
- Strings – City String Orchestra (tracks: A2, C2, D2, D3)
Notes
Sony Music Entertainment (UK) Ltd decline any responsibility for loss, damage or death as a result of exploiting this Tipper production.
Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. All tracks ℗1999 except track C3, ℗2000 Sony Music Entertainment (UK) Ltd. ©2000 Sony Music Entertainment (UK) Ltd. Published by Chrysalis Music Ltd. Distribution Sony Music.
Plain black inner sleeves with catalog number at the bottom.
Original sound recording made by Sony Music Entertainment (UK) Ltd. The copyright in the sound recording is owned by Sony Music Entertainment (UK) Ltd. All tracks ℗1999 except track C3, ℗2000 Sony Music Entertainment (UK) Ltd. ©2000 Sony Music Entertainment (UK) Ltd. Published by Chrysalis Music Ltd. Distribution Sony Music.
Plain black inner sleeves with catalog number at the bottom.
Barcode and Other Identifiers
- Barcode: 5 099749 468511
- Label Code: LC 0162
- Matrix / Runout (Side A Etched): -PAULS ¦ CUTZ-
- Matrix / Runout (Side A Stamped): 4946851000 1A1
- Matrix / Runout (Side B Stamped): 4946851000 2B1
- Matrix / Runout (Side C Stamped): 4946851000 3C1
- Matrix / Runout (Side D Stamped): 4946851000 1D1
- Rights Society: MS/BIEM/SDRM
- Other (Inner Sleeve Catalog Number): 4946851000/BG1
- Other (Inner Sleeve Catalog Number): 4946851000/BG2
Other Versions (2)
View AllTitle (Format) | Label | Cat# | Country | Year | |||
---|---|---|---|---|---|---|---|
Recently Edited
|
The Critical Path (CD, Album) | Higher Ground | HIGH9CD | UK | 2000 | ||
The Critical Path (CD, Album, Promo) | Higher Ground | HGCD34 | UK | 2000 |
Recommendations
Reviews
Release
See all versions
Recently Edited
Recently Edited
For sale on Discogs
Sell a copy
3 copies from €83.24